Work, Reimagined with AI.
Herd AI blog

The spreadsheet outside your software contract

Renewal decisions · Field notes from Herd AI

The invoice says you pay for an approval system. The person doing the job keeps a spreadsheet called “Reopens.” Ask to see it. Not because spreadsheets are bad, but because this one may describe the work the contract leaves out.

Imagine a purchase request rejected for a missing project code. The system records the rejection. Operations looks up the code, writes to the requester, watches for a corrected submission and matches the new approval to the old request. Buying a cheaper approval screen will not necessarily remove any of those steps.

Measure workflow cost where the work moves

Follow one ordinary request and one rejected request with the person who resolves them. Make two columns: time spent doing the work and time spent waiting. In an illustrative week, eight exceptions at 15 minutes each consume two hours of effort. If each also waits overnight, do not report those nights as labor savings. They are a delay problem, and they may matter more than the two hours.

Now compare the incumbent, a custom build and a managed alternative using the same pair of requests. Ask each team to show who notices a failure, where the correction is recorded and how a manager knows the work is complete. If none of the options changes the outside work, record that too.

Bring the spreadsheet owner to the renewal meeting. They may recommend keeping the existing tool and fixing one handoff. That can be a better answer than buying an entirely new system to recreate the same spreadsheet.

Bring a renewal to review · Back to the blog